Sovereign Data CentersPrivate & Multi-CloudLicence Optimisation & IT ConsultingCybersecurity & AI System AuditAgentic AI & Secure RAGSoftware DevelopmentBlockchain SolutionsData Visualisation & AnalyticsInternet of Things (IoT)Data Center & Disaster RecoveryERP for Industry 4.0HRMS SolutionsESG & Sustainability ReportingOpenStack Implementation
Products Partners Use cases Industries About Contact
Home/Use cases
Use cases

Real problems. Measured outcomes.

How we design and deliver AI infrastructure, fault-tolerant DC and DR, Industry 4.0 ERP and HRMS for organisations in India. Client names are withheld, and each case is an illustrative composite that shows how we deliver.

01
Financial services

A sovereign GPU cluster for an Indian-language model

The challenge

A large financial-services group wanted to train and run an Indian-language large language model on its customer-service data. Policy required that data, model weights and encryption keys never leave India, and its existing server room could not power or cool GPU servers.

Outcomes
  • Training and inference fully in-country
  • An auditable chain of custody for data and models
  • A platform other departments can reuse
What we did
  1. 01Assessed power, cooling and floor capacity, and compared building in-house, colocating and a hybrid approach
  2. 02Designed a high-density GPU pod with direct-to-chip liquid cooling and a dedicated low-latency InfiniBand fabric
  3. 03Built a private AI cloud on Kubernetes with GPU scheduling, so teams request compute through a self-service portal
  4. 04Put model weights, datasets and keys under in-country HSM key management with full audit trails
  5. 05Added secure RAG and guardrails so the model answers only from approved, permission-checked sources
Technology
NVIDIA GPU serversLiquid coolingInfiniBandKubernetesHSMSecure RAG
02
Telecoms & colocation

Retrofitting an air-cooled data hall for AI density

The challenge

An operator's data hall was designed for traditional enterprise racks. Customers now wanted to host GPU servers drawing many times more power per rack, and the existing air cooling could not remove the heat.

Outcomes
  • New AI-ready capacity inside the existing building
  • No disruption to existing customers
  • Live capacity data for sales and operations
What we did
  1. 01Mapped power and thermal headroom row by row with computational fluid dynamics (CFD) modelling
  2. 02Created a dedicated high-density zone with rear-door heat exchangers and a liquid-cooling loop, without shutting down live customer racks
  3. 03Upgraded power distribution, busways and monitoring for the new load
  4. 04Rolled out DCIM so every rack's power, temperature and capacity is visible in real time
Technology
CFD modellingRear-door heat exchangersLiquid coolingBusway powerDCIM
03
Banking

Hybrid AI: training in the cloud, inference on-premises

The challenge

A bank wanted to use AI for fraud detection and customer-service assistants. Customer data had to stay on-premises for regulatory reasons, but buying enough GPUs for occasional large training runs would leave them idle most of the time.

Outcomes
  • Customer data stays on-premises
  • GPU spend matched to real demand
  • AI launched with evidence for the risk committee
What we did
  1. 01Designed a workload placement policy: anonymised training data to an India cloud region for burst training, with all live inference on-premises
  2. 02Deployed an on-premises inference cluster sized for low-latency, around-the-clock scoring
  3. 03Built one control plane for identity, policy, monitoring and cost across private and public cloud
  4. 04Red-teamed the customer-service assistant and added permission-aware retrieval and output filtering before launch
Technology
On-prem inference clusterIndia cloud regionUnified control planeFinOpsAI red-teaming
04
Energy & utilities

AI-driven operations and emissions tracking for a data center

The challenge

An operator ran cooling on fixed settings, found equipment faults only after alarms, and compiled energy and emissions figures by hand for sustainability and BRSR reports.

Outcomes
  • Faults spotted before they cause outages
  • Cooling tuned to real conditions
  • Reporting data produced automatically
What we did
  1. 01Installed IoT sensors and smart meters on chillers, CRAH units, UPS systems and racks, connected through secure edge gateways
  2. 02Built a data platform and live dashboards for power, cooling, PUE and emissions
  3. 03Trained predictive-maintenance and anomaly-detection models on equipment telemetry
  4. 04Added AI-assisted cooling recommendations that operators approve before any change is applied
  5. 05Automated the energy and emissions dataset used for BRSR and ESG reporting
Technology
IoT sensorsEdge gatewaysDigital twinPower BI dashboardsPredictive maintenanceESG reporting
05
Education & research

Shared GPU-as-a-service for research teams

The challenge

A research institution had GPU servers spread across departments: some overloaded, some idle, with no isolation between teams and no way to share costs fairly.

Outcomes
  • Higher use of existing GPUs before buying more
  • Fair, transparent cost sharing
  • Sensitive datasets protected
What we did
  1. 01Pooled the GPUs into one cluster with secure multi-tenant isolation per research group
  2. 02Set up quotas, fair-share scheduling and self-service notebooks for researchers
  3. 03Introduced usage metering and chargeback reports per department
  4. 04Applied zero-trust access, encrypted storage and dataset access controls for sensitive research data
Technology
GPU poolingKubernetes + SlurmMulti-tenancyChargebackZero trust
06
Financial services

Security audit and hardening of an AI platform

The challenge

An organisation had moved quickly to deploy GPU servers, model registries and AI APIs. Its security team had little visibility of who could reach the models, where training data came from, or whether the AI endpoints could be abused.

Outcomes
  • Full visibility of the AI estate
  • Critical gaps closed and verified
  • Governance aligned to ISO/IEC 42001
What we did
  1. 01Built an inventory of every AI asset: clusters, models, datasets, pipelines and endpoints
  2. 02Tested network exposure, identity and management interfaces across the GPU infrastructure
  3. 03Reviewed model and dataset supply chain integrity and secured the model registry
  4. 04Red-teamed AI endpoints for prompt injection, data leakage and excessive agency
  5. 05Delivered a ranked remediation plan, fixed critical findings and re-tested
Technology
AI asset inventoryPen testingModel supply chainOWASP LLM Top 10ISO/IEC 42001
07
Banking & NBFC

Three-site DC and DR for core banking

The challenge

A lender ran core banking, payments and internet banking from a single data center, with nightly backups to tape. A power or site failure could stop operations for a day or more and lose a full day's transactions, and the regulator was asking for a tested business-continuity plan.

Outcomes
  • Switchover to DR in minutes instead of a day
  • Zero committed-transaction loss for the critical tier
  • Drill evidence ready for regulatory review
What we did
  1. 01Ran a business impact analysis and grouped every application into recovery tiers, with an agreed RTO and RPO for each
  2. 02Built a near DR site in the same metro with synchronous storage replication, so committed transactions exist in two places at once
  3. 03Added a far DR site in a different seismic zone with asynchronous replication, as protection against a regional disaster
  4. 04Put database-level replication (Data Guard and Always On) on top of storage replication for fast, consistent database failover
  5. 05Moved traffic failover to global server load balancing and dual carriers with BGP, so branches and customers reconnect automatically
  6. 06Wrote runbooks, automated the switchover order and ran the first full DR drill with auditors observing, then repeated it every quarter
Technology
Synchronous replicationOracle Data GuardSQL Server Always OnGSLBBGPImmutable backup
08
Healthcare

Ransomware-proof recovery for a hospital network

The challenge

A hospital group depended on its hospital information system, imaging (PACS) and lab systems around the clock. Its backups sat on the same network as production, so a ransomware attack could encrypt both, and recovery had never been tested end to end.

Outcomes
  • No single room or device can stop clinical systems
  • A clean copy that survives an attack on production
  • Recovery proven in rehearsal, not assumed
What we did
  1. 01Mapped clinical systems and their dependencies, and agreed recovery tiers with clinical and IT leadership
  2. 02Built a stretched cluster across two server rooms on the campus so a hardware or room failure causes no clinical downtime
  3. 03Introduced a 3-2-1-1-0 backup design with an immutable, logically air-gapped copy that admin accounts cannot delete
  4. 04Created an isolated recovery environment where backups are scanned for malware before systems are restored
  5. 05Rehearsed a full ransomware recovery and documented the clinical fallback procedures for the recovery window
Technology
Stretched clusterImmutable backupIsolated recovery environmentVeeamEDRMFA for admins
09
Venues & events

Active-active portal for peak-event traffic

The challenge

A large venue's ticketing and visitor portal had to stay online through major events, when traffic jumps many times above normal. It ran in one site, so any outage during an event would be highly visible.

Outcomes
  • Either site can carry the full load
  • Site maintenance with no visible downtime
  • Peak events served without degradation
What we did
  1. 01Re-architected the application to be stateless, with sessions and queues held in replicated data services
  2. 02Deployed active-active across two data centers behind global load balancing, with health checks that drain a failing site
  3. 03Replicated the database with automatic leader election, and added read replicas and caching for peak load
  4. 04Load-tested above the expected event peak and practised taking a full site offline during live traffic
Technology
Active-activeGSLBKubernetesPostgreSQL PatroniRedisLoad testing
10
Manufacturing

Fault-tolerant plant systems that survive WAN loss

The challenge

A manufacturer's plants depended on ERP and MES hosted at head office. When the WAN link dropped, production lines could not book output or print labels, and shifts were lost.

Outcomes
  • Lines keep running when the WAN fails
  • No lost production records
  • ERP recovery tested on a schedule
What we did
  1. 01Placed a small edge cluster in each plant to run the MES and label services locally, with dual power and redundant switching
  2. 02Set store-and-forward synchronisation so the plant keeps working offline and reconciles with ERP when the link returns
  3. 03Added a second carrier and SD-WAN for automatic path failover between links
  4. 04Protected head-office ERP with warm-standby DR and tested failover twice a year
Technology
Edge clusterSD-WANStore-and-forward syncWarm standbyMonitoring
11
Financial services

Leaving per-core virtualisation licences for OpenStack

The challenge

A financial-services company ran several hundred VMs on a proprietary virtualisation platform. The renewal moved to per-core subscriptions with a minimum core count per CPU, and its new high-core-count servers would have multiplied the licence bill with no new capability.

Outcomes
  • Per-core licence fees removed at renewal
  • Existing servers reused rather than replaced
  • Teams get VMs, Kubernetes and storage on demand
What we did
  1. 01Inventoried hosts, cores and VMs, and built a five-year cost comparison covering licences, hardware, support and operations
  2. 02Designed an OpenStack and Ceph private cloud on the company's existing servers, with a highly available control plane
  3. 03Integrated single sign-on, monitoring, backup and the existing firewalls, and trained the operations team
  4. 04Migrated workloads in waves, converting disks and drivers, with both platforms running side by side and a rollback plan for each wave
  5. 05Rebuilt freed hosts into the new cloud and let the old licences lapse at renewal
  6. 06Added self-service projects, Kubernetes clusters and S3-compatible object storage for development teams
Technology
OpenStackKVMCephOVNKubernetesAnsible
12
Manufacturing

From spreadsheets to a connected Industry 4.0 ERP

The challenge

A multi-plant engineering company planned production in spreadsheets, kept accounts and stores in separate systems, and had no live view of machine downtime or energy use. Customers had started asking for product carbon data.

Outcomes
  • One live view from order to machine to invoice
  • Planned maintenance replacing surprise breakdowns
  • Product-level energy and emissions data
What we did
  1. 01Mapped processes from order to cash and procure to pay, and selected an ERP against the company's own requirements
  2. 02Implemented finance, inventory, production planning and costing in phases, with data migration and parallel runs
  3. 03Connected critical machines over OPC UA and MQTT so ERP work orders show live status, output and downtime reasons
  4. 04Added demand forecasting and predictive maintenance, with supervisor approval required before any plan changes
  5. 05Metered energy per line and allocated emissions per batch for BRSR and customer reporting
Technology
ERPOPC UAMQTTPredictive maintenanceEnergy meteringPower BI
13
Services

Multi-state payroll and self-service on one HRMS

The challenge

A services company with offices in several states ran payroll and statutory filings on spreadsheets. Payroll took days to close, errors reached employees, and employees emailed HR for every payslip and leave balance.

Outcomes
  • Payroll closed in hours, not days
  • Statutory filings generated from the system
  • Routine HR queries handled in self-service
What we did
  1. 01Cleaned and migrated employee, salary and leave data, and configured state-wise professional tax, PF, ESI, LWF and TDS rules
  2. 02Ran two months of parallel payroll and reconciled every difference before switching over
  3. 03Launched a mobile self-service app for leave, attendance, payslips, claims and tax declarations
  4. 04Connected the HRMS to finance and banking for automatic salary journals and payment files
Technology
HRMSStatutory payrollMobile self-serviceBank integrationAnalytics

These use cases are illustrative composites. Client names are withheld and outcomes are described without figures.